Saint Joseph Regional Medical Center - Mishawake, Indiana
Constructed Using our VersaLiner® Brick Tray Products
 |
 |
60% savings in erected time |
85% less brick material used |
Compared to conventional hand laid masonry construction |
To see all images go to the PCI 2011 Design Awardssite.
This system required only 15% of the brick material that would have been used with conventional hand laid masonry. In addition, it was erected in just 40% of the time needed with standard masonry construction. These panels are engineered to be stronger and lighter than standard masonry. Eliminates wall moisture and mold issues and unsightly efflorescence.
|
|